"Whitetower are extremely satisfied with the work undertaken by Zenith SAS to complete the Croydon stack inspection and repair project. The project work from start to finish was completed in an impressive
manner.
Four aspects stood out from a client’s perspective:
1. The project planning, with innovative solutions to a tricky, confined, inner-city location.
2. The strong HSE focus, from both general site safety and legislative aspects.
3. The willingness to collaborate with multiple stakeholders.
4. The rapid provision of engineering solutions in a changing environment.
In particular, it was evident that communications between the site management and the engineering office were very strong. This was clearly a major positive contribution to the overall success of the project.
Whitetower would definitely consider using Zenith SAS for future engineering projects."