Zenith were awarded a contract to carry out extensive repairs to a 96m high steel chimney at a Cycle Gas Turbine station located on the south coast of England.
The refurbishment of the chimney included the removal and replacement of the external access platforms and ladders including the full circumferential platforms at the 50m and 95m level and then the installation of the previously removed access ladders and rest platforms from the 29m to the 95m levels.
Access was gained from suspended access cradles and a full circumferential suspended temporary works platform.
The full scope of works included:
We have a video of this project taken by a UAV operated by structural engineers, Zenith Consultants.