Zenith Structural Access Solutions Limited was awarded the contract, by AMNI International Petroleum Development Company Limited, to design and install a temporary lifting frame to facilitate the replacement of a 907kgs flare tip located on a FPSO offshore in Nigeria.
The design, supply and installation of the temporary lifting frame was carried out completely in-house. Our proven safe method results in significant cost savings when compared with expensive helicopters & barge cranes.