Home / Client Recognition & Project Successes

Client Recognition & Project Successes

Built on Safety, Quality & Teamwork

Delivering safe, high-quality, and professional support across major industrial projects and outages. These acknowledgements reflect the commitment, professionalism, and expertise demonstrated by Zenith personnel across every project.

Venator

"Thank you from all the engineering and operations team with regards to the Zenith members that attended site to support us during our July site services shutdown to inspect our new boiler stack.

They did everything they could to push the job on. They were polite, professional, hardworking and great when challenged by our safety team on the entry and rescue plan aspect of the job. Nothing was too much trouble for them. They were a credit to the company."

Manx Utilities

"I would like to pass on my personal thanks and from Manx Utilities Authority for the work you and your team carried out to repair the diesel flues. The work was conducted in a very professional manner, to a high standard and ahead of schedule. It was a pleasure to have such a competent and proactive team on the project."

ExxonMobil

"What a fantastic milestone for the entire team – truly inspirational!

Looking back with such a huge challenge ahead of us, it’s incredible to think that today we’re celebrating two full, online retubes of both WHBs completed safely. What an achievement.

This success is a testament to your ingenuity, resilience, and true teamwork. Every challenge was met head on, and every obstacle overcome together.

You’ve made Fawley proud – and clearly positioned us for a flagship future. Outstanding work, everyone."

University of Strathclyde, Glasgow

"On behalf of University of Strathclyde, I want to take this opportunity to thank you and your team for the fantastic effort in getting the roof repair works on our Thomas Campbell Court residences completed in time for the students occupying this in January. The team worked hard in what was often challenging weather conditions and the quality of the work in such a short space of time is remarkable and what has been achieved is to be commended.

Throughout this challenging project, there has been a real 'can do' attitude with various contractors and operatives and members of my own team, working together to ensure that the works got done in time and with minimal hassle. The overall quality of the refurbishment is to a high standard considering all the challenges that had to be overcome in what was a very tight deadline.

I am delighted with the outcome, and we look forward to continuing to work with you and the team on future projects in the forthcoming year and beyond."

Whitetower Energy Ltd / River Nene Power Ltd

"Whitetower are extremely satisfied with the work undertaken by Zenith SAS to complete the Croydon stack inspection and repair project. The project work from start to finish was completed in an impressive
manner.

Four aspects stood out from a client’s perspective:

1. The project planning, with innovative solutions to a tricky, confined, inner-city location.
2. The strong HSE focus, from both general site safety and legislative aspects.
3. The willingness to collaborate with multiple stakeholders.
4. The rapid provision of engineering solutions in a changing environment.

In particular, it was evident that communications between the site management and the engineering office were very strong. This was clearly a major positive contribution to the overall success of the project.

Whitetower would definitely consider using Zenith SAS for future engineering projects."

ExxonMobil

"I wanted to take a moment to sincerely thank the entire Zenith team for an outstanding effort. Yet another example of Zenith’s unwavering commitment to tackling challenges head-on. We genuinely appreciate the hard work, adaptability, and solution-focused mindset that kept safety as the top priority throughout."

ExxonMobil

"We would like to say a big thanks to the Zenith team for the work completed and effort put in from everyone to achieve the end goal and more. The team took it upon themselves to split the shift to ensure continuous work was being done to enable the deadlines not only to be met but to come in earlier which is a testament to all the team's work ethic. Many thanks again to you all."

Kanadevia Inova

"I would just like to extend our sincere thanks to Zenith for all the input, support, and coordination throughout the project. For our first outage it went exceedingly well. The full team on site were exceptional, very experienced, and professional. It was a pleasure having them on site, and their expertise was greatly appreciated by everyone.

Once again, it was a pleasure working with you all, and we look forward to having you back on site again in the future."

Vifutech

"I am reaching out to express my sincere appreciation for the exceptional service your team provided during the maintenance plan of the flare stack. Your team's efficiency, positivity, and professionalism significantly contributed to the project's success, making it a truly rewarding experience for me involved. I surely will do everything to bring your team back in the future."

Helleniq Flare Replacement

"On behalf of Helleniq, thank you very much for the immediate and excellent response.

The flare stack repair was successful, and it is back in service.

Your people were efficient, precise and in the same time safety oriented and disciplined, as all professionals should be."

Viridor

"I would like to take a moment to thank Zenith for their support and commitment during what has been a very challenging period.

All works were delivered without any accidents or safety incidents, which reflects well on everyone involved and demonstrates a strong collective focus on safety, even under challenging conditions.

Please pass on my thanks to your team on site. Your efforts and commitment played a key role in achieving a safe and successful outcome."

Here you can save services you are interested in


Your Enquiry

Fill in your details below to continue