Zenith was awarded the contract to install specialist access internally on a reformer heater. The obvious challenge was to design a means of access in a confined space where traditional scaffolding tubes were not suitable for the narrow and cramped working conditions.
After establishing a confined space control system, innovative scaffold tube components were designed and installed allowing ease of erection and a Niko rail lifting system was installed to allow suitable access for others to carry internal repairs.